West Hampstead Square

Skyler were principal contractor for these six residential blocks in West London.

The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.

Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.

Systems Used:

  • Anchor Safety Points
  • Bituminous Carrier
  • Brown Roofs
  • Capping
  • Cold Applied Temporary Waterproofing System
  • Fall Arrest System
  • Finishes
  • Fully Reinforced Cold Applied Waterproofing System
  • Handrail & Mansafe
  • Liquid Waterproofing
  • XPS Insulation

Architect:

N/A
Company Number: 08686732 | Registered in England & Wales